GControl blog
Articles from the GControl team on the questions we are asked most often.
-
· 4 min read
Daily Work Report: What the Law Requires and What It Doesn't
Is the daily work report mandatory? What Article 34.9 of the Workers' Statute requires, and the data you need to know what each job really costs you.
-
· 7 min read
Work report template in Word: how to build one that works
How to build a work report template in Word with the fields your office needs, fill it in properly and avoid the mistakes that later cost hours.
-
· 5 min read
Work report template for an industrial maintenance contractor
A work report template for industrial maintenance contractors: the fields to include, how to fill it in by crew, and how it flows into job costing and payroll.
-
· 4 min read
KPIs for a Technical Services Company: Which Ones to Track
The KPIs worth tracking in an installation, maintenance or assembly firm: margin per job, hours, quotes, stock and invoicing, and what to do when they slip.
-
· 5 min read
Work Reports and Accounting: Connecting Both Sides of the Firm
How to link work reports, materials, invoices and accounting so that the cost of each job and the company's accounts tell the same story.
-
· 4 min read
Travel and Per Diems for Off-Site Installation Jobs
Which per diems and mileage are tax-exempt under Spain's IRPF Regulation when your crew works away, what to document and how to charge them to each job.
-
· 4 min read
Working Time Record Signature Sheet from Work Reports
What Article 34.9 of Spain's Workers' Statute requires of the working time record, and how to produce the signature sheet from work reports without logging hours twice.
-
· 4 min read
Material shrinkage: how to allocate it across your jobs
What to do when the warehouse count doesn't add up: where shrinkage comes from, how to adjust stock and which criteria to use to share its cost across jobs.
-
· 4 min read
Quoted vs actual cost by work package: find where margin went
How to compare quoted and actual cost work package by work package, spot hours and material overruns, and use what you learn to quote better next time.
-
· 4 min read
Unproductive hours: where your team's paid time goes missing
Where paid hours that are never charged to a job go in an installation or technical services firm, how to measure them with work reports and how to cut them.
-
· 5 min read
Maintenance Contracts and One-Off Jobs in One System
How to manage maintenance contracts and one-off jobs in a single system, keeping hours separate so you know exactly what each one earns you.
-
· 4 min read
Real hourly labour cost by job category: how to calculate it
How to work out what an hour of a foreman, skilled operative or labourer really costs, which costs to add and which hours to count, so you never quote at a loss.
Contact
We'll show you GControl with your own jobs
Fill in the form and we'll call you to set up a free, no-obligation demo.
- Phone+34 959 54 07 12











