If the jobs in your company go by names like “Juan's plant job”, “the warehouse installation” or “Tuesday's breakdown”, you will never know how much you have earned on each one. Hours and materials end up recorded against names that change depending on who writes them, and at the end of the month nobody can add anything up. The solution is dull but effective: a single code for each job, decided before you start and used by everyone. In this article we explain how to design one so that it genuinely helps when you calculate margins.

What a job code is for

A code is not an office whim. It is the label that ties together everything that happens on a job: the quote, the timesheets, the material deliveries, the invoices and the delivery notes. If each of those documents carries the same code, you can add them up without interpreting anything. If they do not, someone has to guess which job each sheet belongs to, and that is where money gets lost without anyone noticing.

A good code lets you answer three questions without opening any folders:

  • How much this job has cost (labour and materials).
  • How much you have invoiced for it.
  • What you have been left with, and whether it is close to what you quoted.

It also lets you group things: all the jobs for a customer, all those in a given year, all those of a particular type of activity. That is where useful conclusions begin, such as finding that a customer's maintenance work earns you a margin while their installations do not.

What the code should contain

The most practical approach is a code with fixed parts, each with its own meaning. A structure that works well in companies doing installations, fitting or maintenance is this one:

PartWhat it indicatesWhy it helps
YearThe financial year in which the job is openedSeparates the history and avoids repeated numbers from one year to the next
CustomerA fixed number per customerGroups everything you do for each customer
Type of activityAssembly, maintenance, repair, installation…Compares margins between lines of business
NumberA sequential job numberIdentifies the job unambiguously

For example, a code such as 26/14/01/1028 would read as follows: year 2026, customer 14, activity 01 (mechanical assembly) and job number 1028. Anyone who sees it on a work report knows what it refers to without having to ask.

What to avoid

  • Codes with a hidden meaning that only the person who invented them understands. If that person leaves, the system leaves with them.
  • Too many levels. Nobody fills in a twelve-part code correctly on a work report at the machine.
  • Reusing numbers. A closed job keeps its number for good.
  • Overlapping activity types. If “repair” and “breakdown” mean the same thing, half the jobs will go to each and no comparison will be reliable.

The quote needs a code too

The most common mistake is to start coding when the job is already under way. If the quote has no code, there is nothing to compare against later. The best approach is for the quote to be created with its code and, once the customer accepts it, for that same code to become the job's code. That way, what was quoted and what was delivered are linked from day one.

Within the quote, break down labour and materials into chapters and items. You do not need to go down to the last screw: it is enough for the chapters to match real phases of the job (structure, piping, electrical panel, commissioning…). Those same chapters will later help you see in which phase the budget slipped.

How to allocate hours and materials to the code

The code is only useful if everything the job consumes is recorded against it. There are two main sources of cost:

  1. Hours. Each work report states the code and the activity. If an operative spends the morning on one job and the afternoon on another, the report shows it on two lines.
  2. Materials. Every purchase for a job carries its code on the order and on the delivery note. Anything that leaves the warehouse is also recorded against the job that uses it.

A simple rule for the team: if you do not know the code, ask before filling in the report. A phone call is cheaper than a wrongly allocated hour that nobody will be able to correct later.

Open and closed jobs

Define when a job is open to allocations and when it is closed. A closed job should not receive any more hours or materials; if something turns up late, someone with sound judgement should review it before accepting it. This prevents costs from piling up on old jobs or hiding in jobs that have already been invoiced.

From the code to the margin on each job

Once the code is in place, calculating the margin is a subtraction: the amount invoiced minus the valued labour and the materials allocated. What used to be an estimate becomes a hard figure. Some useful checks to make once a month:

  • Jobs with a negative margin and why (more hours than quoted, unforeseen materials, rework).
  • Jobs with hours logged but not yet invoiced.
  • Differences in margin between types of activity and between customers.
  • Jobs that are still open but have had no activity for weeks.

Over the years, that history helps you quote better: you will know how many hours a similar installation really takes and can adjust the price before signing.

A note on getting started: you do not need to recode the whole history. Begin with new jobs from a specific day, leave the old ones as they are and, if necessary, open a code for each long job still in progress. Within a few weeks the team gets used to writing it on the reports and the office stops chasing paperwork.

How GControl does it

GControl codes quotes and jobs in a standardised way, so you can classify them by year, customer and type of activity. Each quoted job carries its quoted labour and associated materials, broken down into the chapters and items that you define. When the quote is approved, the job is opened to allocations: the workers' work reports and the materials assigned to it. Its invoices and delivery notes are issued from each job, and with all of that you have the cost, the income and the profit for each one.

You can see how it all comes together on the cost per job page, or browse the rest of the GControl features.