Delivery to the job
Each material delivery, with its supplier and delivery note, is charged to the job at its cost.
GControl's materials management charges each material delivery to the job that receives it, at its cost, in the material categories and families you set up. So job materials are tracked job by job.
Material deliveries
Each material delivery, with its supplier and delivery note, is charged to the job at its cost.
Suppliers' delivery notes are imported from Sage: nobody keys them in twice.
Each delivery is classified in the material categories and families you set up, so you can see where the material goes.
Materials control
The materials control reports give you, for each job, the material it has received and the detail, delivery by delivery.
So the cost of every job includes the real materials, alongside the hours on the job sheets, and you can compare it with the materials you put in the quote, line by line.
Why it matters
A job that isn't charged with the material it received looks cheaper than it is. And the one that ends up with material that wasn't its own looks more expensive.
Through material deliveries: each delivery, with its supplier and delivery note, is charged to the job at its cost. Delivery notes are imported from Sage, and the materials control reports give the detail for each job.
With the hours on the job sheets valued at the rate card of each job grade, plus the material delivered to each job.
For companies that work job by job and need to know what each job costs them: mechanical installation, industrial maintenance, installations, structures, technical services…, with their own staff, job sheets and materials.
Yes. GControl imports delivery notes and invoices from Sage, so you can compare the cost of each job with what was invoiced, and exports payroll data to Sage.
GControl
Job sheets that work for payroll and for the cost of every job, from Windows or the mobile app.
Job costing with coded jobs, job sheets valued at the rate card, materials and invoicing from Sage.
Quotes by line item with tracking, jobs with their own code and work orders signed at the start and at the end.
What a daily job sheet template should include, to fill in by hand or print, and how to move it to the phone.
For industrial maintenance contractors: signed work orders, job sheets from the plant and the cost of every job.
For mechanical and industrial installation contractors: quoted versus actual, with job sheets, travel and materials.
We'll show you GControl with your company's own jobs, with no obligation.